Procedures for the execution of works in Enel Ceará distribution network – case study - Santana do Acaraú
DOI:
https://doi.org/10.5020/23180730.2024.15441Abstract
This work presents the procedures necessary to carry out works in Enel's energy distribution network in Ceará State to provide quality and reliable products to a captive customer. For this, the partner company holding the contract for executing works must comply with the steps and procedures described in work instruction WKI-NDBR-DCE-18-0065-EDCE: Construction and Renovation of de-energized high and low voltage overhead lines. It begins by describing the initial operation of the high- and low-voltage power distribution systems in the State, such as the electrical configuration and voltage level of the primary and secondary networks. After that, the steps to carry out work in the distribution network are presented, as indicated in the aforementioned work instructions. Finally, a case study is presented in which a high voltage network extension work was carried out by the company B&Q Energia in the city of Santana do Acaraú, showing all the steps carried out by the contractor obeying the work instructions.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Caio Erik Teixeira Silva

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Opinions expressed in the paper on of their texts, agree that Revista Tecnologia will have the right to disseminate them through print and electronic media. RT reserves the right to make, in the originals, normative, spelling and grammatical changes, with a view to maintaining the cultured standard of the language, respecting, however, the style of the authors.